![]() |
![]() |
||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
BB Barth Ltd. • Your Partner for Navigation • Hydraulic Engineering • Environment • Ammunition Salvage • Diving Work |
|||||||||||||||||||||||||||||||||||
| Salvage Missions | |||||||||||||||||||||||||||||||||||
| We offer extensive service packages for the salvage work sector. Here some examples: | |||||||||||||||||||||||||||||||||||
| Salvage of an erratic boulder | Salvage of a siphon pipe | ||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||
| Erratic
boulder salvage Port Mukran 2003 The boulder was uncovered by means of divers and excavator techniques. Finally, it was placed on a kind of a pedestal, ready for salvage. A heavy-lift crane has salvaged the 95 t heavy boulder from the water. |
Siphon
pipe salvage • Port Stralsund Total length of the siphon pipe added up to approximately 100 m |
||||||||||||||||||||||||||||||||||
| Bautaucherei und Bergungsbetrieb Barth GmbH • Gewerbegebiet Am Betonwerk 5 • D 18356 Barth • Telefon: +49 (0)3 82 31 / 8 37 10 • Fax: +49 (0)3 82 31 / 45 68 9 | |||||||||||||||||||||||||||||||||||